Arrival at ExCel
30th April, 01:05pm
The low loader arrives at ExCel in London
Panels leave the Flying Factory
30th April, 09:30am
Panels leave the Flying Factory to arrive at ExCel ready for Grand Designs Live
Building the final panel
21st April, 12:42pm
Peter and Tom are back at the Flying Factory building a final panel. It is important to make sure that the timber is square all round and the metal cross bars enable them to do this by measurement.
Cladding the straw bale
18th April, 11:33am
Expert plastering contractor Merl Cunliffe arrives on site to begin the process of cladding the straw bale panels.
The wooden components
17th April, 06:52pm
The wooden components for the panel are pre-cut to order from renewable sources.
Huge straw bale
16th April, 03:07pm
Dave and Tom finish off a huge straw bale panel ready for the lime render to be applied.
Hemcrete panels
16th April, 10:48am
Ian Pritchett and his team arrive at the flying factory to assist in the development of four hemcrete panels.
The panel
15th April, 02:52pm
Arriving at the 'Flying Factory'
15th April, 10:46am
Peter Homer arrives at the 'Flying Factory' near Rainham in Essex.