Back to Summary

Blog

  • Home
  • Projects
  • ModCell Overview
  • Concept
  • Assembly
  • Structural
  • Costs & Services
  • Research
  • BaleHaus
  • Technical
  • Downloads
  • FAQs
  • Photo Galleries
  • Blog
  • Contact

The First Floor Goes On

5th May, 07:23pm

The wooden first floor of the building is craned in to position

 

Taking Shape

5th May, 05:14pm

The building starts to take shape

 

ModCell Director Craig White

5th May, 02:00pm

ModCell Director Craig White explains the key benefits of the system

 

Margaret Cooke oversees the slab fixing

5th May, 12:23pm

Structural Engineer Margaret Cooke oversees the slab fixing

 

Day 2 of Grand Designs Live

5th May, 09:41am

It's Day 2 of Grand Designs Live

 

Grand Designs Really Live

4th May, 08:05pm

The show goes live on Channel 4 British TV

 

Bill Bailey arrives at the site

4th May, 07:24pm

Comedian Bill Bailey arrives at the building site

 

Grand Designs Going Live

4th May, 06:18pm

Preparation gets under way for Kevin to start building the house

 

Checking the construction

4th May, 04:09pm

Craig White and Margaret Cooke check the straw bale panel layout

 

Grand Designs Site

3rd May, 06:56pm

Plan view of the Grand Designs Site

 

< Prev 1 2 3 4 5 Next >

 

Results 31 - 40 of 49

Company Registration number: 05577135
Patent Pending No. 0803489.4
Site by whitedesign +