Back to Summary

Blog

  • Home
  • Projects
  • ModCell Overview
  • Concept
  • Assembly
  • Structural
  • Costs & Services
  • Research
  • BaleHaus
  • Technical
  • Downloads
  • FAQs
  • Photo Galleries
  • Blog
  • Contact

Final Day At The House

9th May, 11:19am

The Final Day's Building at the ExCel site

 

Life Is In The Detail

8th May, 06:55pm

At the end of the day things are looking good but the team are tired

 

Photo Voltaic Cells On The Roof

8th May, 04:47pm

A bank of photo-voltaic cells are installed.

 

Solex Solar Roof Goes On

8th May, 04:39pm

The solar roof is fixed into place.

 

Recycled Materials

8th May, 03:10pm

Water bottles are being recycled to build an interior wall

 

Interior Shot [2]

8th May, 01:12pm

Interior shot [2] shows the ModCell integrating with the stairs and rammed earth wall.

 

Interior Shot

8th May, 01:10pm

An interior shot of the house shows the rammed earth wall, staircase and Facit system on the upper floor.

 

Roof Covering Goes On

8th May, 12:06pm

The roof covering is glued onto the lightweight wooden structure.

 

Day 5 - Another Perfect Day For Building

8th May, 11:00am

The House That Kevin Built Is Looking Good

 

Bruce Bell and Nick Willson explain the Facit System

7th May, 04:05pm

Bruce Bell and Nick Willson explain the Facit kit system of construction

 

< Prev 1 2 3 4 5 Next >

 

Results 11 - 20 of 49

Company Registration number: 05577135
Patent Pending No. 0803489.4
Site by whitedesign +